Laying the floorwith adhesive.
Laying the floors and coatings with adhesive involves the following steps: First the sub-base is checked for cracks to avoid any problems when the work will be completed.
Then the laying surface is checked for flatness so that a proper execution can be guaranteed.If there are large imperfections on the support, the sub-base is levelled by applying levelling compounds. Finally, the surface is carefully cleaned so the adhesive can adhere properly.
The floor is laid and the operation is checked by using a PVC trowel. The final step includes the floor filling which is carried out by filling the tile gaps with suitable sealants.